top of page

Tower assembly

Orbit 12 Assembly

pump.png

Pump

n2_edited.png

Tank

43_edited.png

Cover

pump.png
pump.png

Pipe

42_edited.png

Bottom

PLANT_TOWER_NEW v1 v8_edited.png

Section

2_edited.png

Crown

Component1.png

Netpot

 connector

pipe.png
screw.png

Screw

Step 1

Add pump into Tank & Connect pipe with the help of connector to the pump

n2_edited.png

Tank

Pipe with

connector

pump.png
pump.png

Pump

pump.png
pump.png

Attacg pipe to pump

Step 2

Add base to the Top cover Insert screws and nuts through holes

PLANT_TOWER_NEW v1 v8.png

Section connected to bottom

43_edited.png

Cover

screw.png

Screwe nut

Attach Base to tank cover with help of 4 screws

PLANT_TOWER_NEW v1 v15 v9_edited.png
Step 3

Add top cover to the tank

PLANT_TOWER_NEW v1 v15 v9_edited.png

Previously

attached bottom and cover

No Brand 20 manual (2)_edited.png

Tank with pump

Add top cover to the tank

36 manual_edited.png
Step 4

Add Sections one by one. Along with that, attach the central pipe with help of connector.

Pipe connector

pipe.png

Pipe

pump.png
42_edited.png

Section

PLANT_TOWER_NEW v1 v15 v9_edited.png

Add Sections one by one

Attach pipe with connector

12 planter Manual_edited.png
Step 5

Add Crown over the top section & Add all net pots

2_edited.png

Crown

Component1.png

Netpots

12 planter Manual (1)_edited.png

Add crown

Assembly Video

bottom of page